The Coastal Protection and Restoration Authority (CPRA) and its federal, state, and local partners are advancing a coordinated program of marsh creation, ridge restoration, and sediment infrastructure projects across the Breton Sound Basin.
Together, these projects are restoring wetlands, strengthening community resilience, and building long-term protection for communities, including Delacroix, Reggio, Yscloskey, and surrounding areas in St. Bernard Parish and Plaquemines Parish.
As of May 2026, five projects are complete or under active construction, representing an investment of approximately $121.1 million.
The sediment volume placed through these projects is equivalent to roughly one and a half months of Mississippi River sediment at average flow.
Projects in the Breton Sound Basin are designed and built as an interconnected system rather than as stand-alone efforts.
Sediment is hydraulically dredged from nearby water bodies such as Lake Lery and transported to restoration sites to create and nourish marsh habitat. During construction, containment dikes are used to shape marsh creation areas and retain sediment while newly created wetlands stabilize.
This phased delivery approach allows planning, engineering, permitting, and construction activities to continue simultaneously across multiple projects, ensuring steady progress throughout the basin.
Mid Breton Land Bridge Marsh Creation and Terracing (BS-0032)
Located near Delacroix, this project creates and nourishes intertidal marsh using sediment hydraulically dredged from Lake Lery.
Project Highlights
Dredging operations began in July 2024 and are scheduled to finish by April 2026.
View BS-0032 Project CIMS Page
Breton Landbridge Marsh Creation West (BS-0038)
This project restores marsh south and east of Grand Lake within the Breton Sound land bridge alignment identified in Louisiana’s Coastal Master Plan.
Project Highlights
The project demonstrates how multiple funding programs can be leveraged to advance large-scale coastal restoration efforts efficiently.
View BS-0038 Project CIMS Page
East Delacroix Marsh Creation and Terracing (BS-0037)
The East Delacroix project addresses land loss caused by hurricanes, erosion, and saltwater intrusion through marsh creation and terrace construction.
Project Highlights
Mobilization for terrace construction is expected during summer 2026.
View BS-0037 Project CIMS Page
Lake Lery Marsh Creation Phase II (BS-0034)
This project continues ongoing restoration efforts near Lake Lery through a phased approach focused on marsh creation and nourishment.
Project Highlights
View BS-0034 Project CIMS Page
Bayou Terre Aux Boeufs Ridge Restoration Phase II (BS-0045)
This completed project strengthened portions of the Bayou Terre Aux Boeufs Ridge system near Delacroix through shoreline armoring and reforestation.
Project Highlights
The project helps stabilize remaining ridge habitat and supports long-term resilience in adjacent marsh areas.
View BS-0045 Project CIMS Page
An additional eight projects are currently advancing through engineering and design phases across the Breton Sound Basin.
East Bank Sediment Transport Corridor (BS-0033)
St. Bernard Parish is developing plans for a permanent dredge pipeline corridor extending from the Mississippi River to the Breton Sound Basin.
Once constructed, the corridor would create a more efficient and economical way to transport sediment for future restoration projects across the basin.
The project is intended to:
View BS-0033 Project CIMS Page
North Delacroix Marsh Creation and Terracing (BS-0041)
This project proposes:
Land rights and servitude activities are ongoing.
View BS-0041 Project CIMS Page
Reggio Marsh Creation and Hydrologic Restoration (BS-0043)
Located east of the Reggio community, this project combines marsh creation with hydrologic restoration features.
Planned Features
Construction advertisement is anticipated during the third quarter of 2026.
View BS-0043 Project CIMS Page
Yscloskey Marsh Creation (BS-0046)
The Yscloskey project would restore marsh along the historic Bayou la Loutre ridge alignment.
Planned Benefits
Engineering and design activities are expected to conclude in late 2026.
View BS-0046 Project CIMS Page
South Delacroix Marsh Creation (BS-0047)
This project aims to restore wetlands impacted by hurricane damage, erosion, and saltwater intrusion.
Planned Features
View BS-0047 Project CIMS Page
Wood Lake – East Lake Lery Restoration (BS-0048)
This multi-feature restoration effort combines marsh creation, terraces, and shoreline restoration concepts.
Current work includes expanded data collection and site evaluations to determine the most effective restoration features for implementation.
View BS-0048 Project CIMS Page
Phoenix Marsh Creation – East Increment (BS-0042)
This project remains on hold pending the allocation of construction funding.
Phoenix Marsh Creation – West Increment (BS-0044)
This project remains on hold pending the allocation of construction funding.
Funding and Partnerships
The Breton Sound Basin restoration program is funded through a combination of:
These partnerships allow federal, state, and local resources to be combined and deployed efficiently across multiple projects.
Several projects leverage multiple funding sources within a single construction effort, helping maximize restoration delivery and close funding gaps.
Community and Environmental Benefits
The coordinated restoration program strengthens natural defenses across the Breton Sound landscape by:
By restoring wetlands at scale, these projects help provide additional protection for coastal communities while supporting Louisiana’s long-term coastal restoration strategy.
CPRA and its partners continue advancing restoration efforts throughout the Breton Sound Basin through ongoing engineering, design, permitting, and construction activities.
Future investments — including sediment transport infrastructure and expanded marsh restoration — are intended to improve long-term project delivery, increase cost efficiency, and sustain restoration momentum across southeast Louisiana for decades to come.
Aerial video of the project sites can be downloaded on CPRA’s Vimeo Page.