Sign Up. Stay Informed.
September 2010: Final Integrated Feasibility Study and Supplemental Environmental Impact Statement for the Medium Diversion at White Ditch
September 2013: USACE Preconstruction Engineering and Design Location Analysis
September 2013 USACE Preconstruction Engineering and Design Location Analysis-Briefing
December 2013: Feasibility Study – Hydrodynamic and Sediment Transport Modeling using FLOW-3D for Siting and Optimization of the LCA Medium Diversion at White Ditch
December 2013 Feasibility Study – Hydrodynamic and Sediment Transport Modeling using FLOW-3D for Siting and Optimization of the LCA Medium Diversion at White Ditch -Location 1
January 2016: Mid-Breton Sound Sediment Diversion Independent Technical Design Review